Contract award · 5 Jan 2021

Beckton Depot Northern Sidings Project

Docklands Light Railway Limited awarded “Beckton Depot Northern Sidings Project” to Buckingham Group Contracting Limited on 5 Jan 2021.

Construction workLondon

Competition with a shortlist

Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.

Key facts

Value
Not published
Procedure
Negotiated procedure with prior call for competition
Sector
Construction work · Railway depot construction work (CPV 45234112)
Region
London
Timeline
  1. Contract date5 Jan 2021
  2. Published19 Feb 2021Published 45 days after the contract date

Description

Docklands Light Railway (DLR) is procuring 33 new fixed formation trains as part of its Rolling Stock Replacement Programme (RSRP) to replace the life expired B90/92 fleet and 10 new fixed formation trains. The new trains are needed to meet the service requirements for future growth and development in the Royal Docks area. In order to facilitate these new trains, the maintenance and stabling capacity of the Beckton Depot (located in London) will need to be upgraded. The works required to be undertaken; Area 1: Installation of surface water drainage, Train Wash with road access and associated Pump Room. Completion of a retaining wall will be required, along with an attenuation tank up to 100m3. Installation of a security access fence to the site boundary.A new ATO Test Track with a level crossing,. Attenuation will be required within this area and current drainage calculations suggest this will not be larger than 100m3. Also, Rolling Stock AVI (Automatic Vehicle Inspection) is required to be housed alongside the train wash. As previously stated the scope includes installation of a retaining wall r construction of the eastern section of the retaining wall will need to take place following the decommissioning of the current test track. Area 2: Installation of hoarding, decommission of existing roads D, E and F, installation of drainage and associated services. To achieve this, decommissioning existing roads D, E and F will be required, prior to the installation of drainage and associated services to support the works. Area 1/2 Combined: Installation, test and commission of ballasted track and associated access platforms for new roads BA – BK inclusive; all roads to be signalled and controlled as per design. To achieve this, installation, test and commissioning of 11no stabling roads. The disciplines included are: i. Track (including associated ballast and tamping) ii. Civils (including platforms) The works also include the installation, test and commissioning of the services to allow the use of the stabling roads. The disciplines include, but are not limited to: i. Power (LV and traction) ii. Lighting (including columns) iii. Water provision for cleaning iv. CRMS v. 2no REBs (Relocatable Equipment Buildings) to house points and points heating control. Train delivery roads will need to be provided to enable the delivery of the new rolling stock.

About the supplier

More from Docklands Light Railway Limited

All contracts

No contracts to show yet.

Recent construction work contracts

Sector overview