Contract award · 30 Apr 2026

Washwood Heath Depot and Network Integrated Control Centre

High Speed Two (HS2) Ltd awarded “Washwood Heath Depot and…” to Joint Venture, Taylor Woodrow infrastructure Limited and Aureos Rail Limited.

Mining & metalsWest Midlands

Competition with a shortlist

Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.

Key facts

Value
Not published
Procedure
Negotiated procedure with prior call for competition
Sector
Mining & metals · Gravel, sand, crushed stone and aggregates (CPV 14210000)
Timeline
  1. Contract date30 Apr 2026
  2. Published21 May 2026Published 21 days after the contract date

Description

The WWH & NICC Contractor is responsible for the design, fabrication, assembly, supply, construction, installation, supervision, inspection, testing, system commissioning and safety authorisation of a rolling stock depot and the design, build and commissioning of a Network Integrated Control Centre at Washwood Heath in Birmingham (including maintenance of all the works up to their completion). Scope includes: - A maintenance building located within the depot - building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, welfare and domestic provisions, building security and a building management system; - The maintenance building will contain light and heavy maintenance plant and equipment facilities (gantry cranes, monorail cranes, access gantries, access pits, inspection and maintenance roads, heavy cleaning facility, heavy lift and bogie drop facilities, depot offices, depot control cen…

About the supplier

More from High Speed Two (HS2) Ltd

All contracts

Recent mining & metals contracts

Sector overview