Open competition
Open procedure: the contract was advertised and any supplier could submit a bid.
Key facts
- Buyer
- Turner & Townsend · Contract subsidised by a contracting authority
- Supplier
- Absolute Solar and Wind Ltd SME
- Value
- £6,287,300
- Procedure
- Open procedure
- Sector
- Fuel & energy · Solar energy (CPV 09330000)
- Region
- Scotland
- Official notice
- 048348-2025 on Find a Tender
- Timeline
-
- Contract date7 Jul 2025
- Published13 Aug 2025Published 37 days after the contract date
Description
The Aberdeen Hydrogen Hub Solar PV Plant will be a ground mounted PV system at the site of the former Ness landfill, which is located 2 km south of Aberdeen city centre, on Coast Road adjacent to Nigg Bay, to the south of Aberdeen Harbour and approximately 4km northeast of Cove Bay. The Contractor should design the solar plant taking into consideration that this is located on a capped landfill site, which still requires safe management by the incumbent waste management contractor via a venting and drainage system. The site will be linked by an underground connection to the hydrogen production plant and vehicle re-fuelling facility. The Works to be undertaken by the Contractor relate to the civil and mechanical construction works of the solar PV plant and all electrical works to (but not including) a metering circuit breaker on site (the Connection Point). The Contractor shall provide: 1. Design, procurement, installation, construction, commissioning and testing for the solar installat…
About the supplier
Absolute Solar and Wind Ltd: every public contract they have won.