Contract award · 27 Oct 2025

Pont Ends River Restoration: Detailed Design

Environment Agency awarded “Pont Ends River Restoration: Detailed Design” to Fishtek Consulting for £53,004 on 27 Oct 2025.

Waste, cleaning & environmentalLondon

Value £53,004

Competition with a shortlist

Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.

Key facts

Buyer
Environment Agency · Ministry or any other national or federal authority, including their regional or local subdivisions
Value
£53,004.25
Procedure
Call-off from a framework agreement
Sector
Waste, cleaning & environmental · Environmental services (CPV 90700000)
Region
London
Timeline
  1. Contract date27 Oct 2025
  2. Published28 Oct 2025Published 1 day after the contract date

Description

The Pont and Blyth Rivers flow eastwards through south Northumberland, entering the North Sea at the town of Blyth. Both rivers have a long history of management by the Environment Agency (EA), National Rivers Authority, Northumbrian Water and the Catchment Boards resulting in significant degradation of the rivers and associated water dependent habitats across the catchments. The impact of this historical management is evident through the current Water Framework Directive (WFD) status of the waterbodies across the catchment with 14 waterbodies at moderate WFD status (of which 7 are heavily modified) and 1 at poor WFD status The Pont Ends Project aims to support an improvement in the WFD status of the Blyth from Pont to Tidal Limit waterbody (GB103022077052). This waterbody is designated as a heavily modified waterbody, currently at moderate WFD status. Historical management across the waterbody has included extensive dredging, the installation of extensive flood embankments and discon…