Contract award · 2 Jul 2026

S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews

National Highways Limited awarded “Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the…” to AtkinsRéalis Jacobs Joint Venture for £273k.

Research & developmentWest Midlands

Competition with a shortlist

Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.

Key facts

Buyer
National Highways Limited · National or federal agency/office
Value
£272,959.34
Procedure
Call-off from a framework agreement
Sector
Research & development · Development consultancy services (CPV 73220000)
Timeline
  1. Contract date2 Jul 2026
  2. Published3 Jul 2026Published 1 day after the contract date

Description

Barton High Level Bridge (BHLB) is an eighteen-span steel-concrete composite structure carrying the M60 over the Manchester Ship Canal. The original bridge, constructed in 1960, comprised two independent deck halves formed from four longitudinal composite girders each, separated by a central reserve joint and supported by reinforced concrete bank seat abutments and hollow-column piers. The bridge was later widened between 1986 and 1989 as part of the M63 improvement works, with new edge girders and an extended deck slab added on both sides. Pre-widening investigations identified slight alkali-aggregate reactivity (AAR) in the original concrete, prompting a change in design approach. Instead of creating monolithic widened piers, the new outer supports were redesigned as independent, free-standing hollow reinforced-concrete columns founded on separate piles and connected to the original piers via link-and-pin "Pin Bearings". This configuration allowed independent vertical behaviour whil…