Contract award · 11 Jun 2025

T0680 Validation of integral bridge abutment design methods - phase 3

National Highways Limited awarded “Validation of integral bridge abutment design methods - phase 3” to Atkins Jacobs Joint Venture for £149k.

Research & developmentWest Midlands

Competition with a shortlist

Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.

Key facts

Buyer
National Highways Limited · Body governed by public law
Value
£149,152.68
Procedure
Call-off from a framework agreement
Sector
Research & development · Development consultancy services (CPV 73220000)
Timeline
  1. Contract date11 Jun 2025
  2. Published2 Jul 2025Published 21 days after the contract date

Description

This work is looking to provide evidence to improve our understanding of behaviour of integral bridges and validate against numerical modelling and the current BS PD 6694-1 (Recommendations for the design of structures subject to traffic loading to BS EN 1997-1:2004+A1:2013) referenced in CS459 predictions to enable the development of an improved calculation approach for integral bridges more broadly. This will be achieved by capturing and analysing data over a continuous period of 5 years from the time of construction to support investigation of the soil structure interaction and overall bridge performance. Data will then be interpreted to support analysis of the DMRB. The strategic objectives of the project are: - to safely improve the design of construction while reducing capital and carbon costs by more efficient use of materials in future integral bridge construction; - to provide accurate and reliable measurements to understand the total life cycle for these structures; - to ext…