Contract award · 3 Jul 2026

The Supply of Electric Vehicle Charging Infrastructure and Associated Services 2025-2040 - AWARD

Bedford Borough Council awarded “The Supply of Electric Vehicle Charging Infrastructure and…” to Connected Kerb Limited on 3 Jul 2026.

Construction workEast of England

Value Not published
WinnerConnected Kerb Limited SME

Competition with a shortlist

Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.

Key facts

Buyer
Bedford Borough Council · Regional or local authority
Value
Not published
Procedure
Restricted procedure
Sector
Construction work · Installation of cable infrastructure (CPV 45314300)
Timeline
  1. Contract date3 Jul 2026
  2. Published6 Jul 2026Published 3 days after the contract date

Description

The purpose of this ITT is to appoint a single Charge Point Operator, to deliver Bedford Borough Council's requirements for a "full turnkey" solution to supply, install, connect, commission, operate and maintain a network of charge points on behalf of the Council across the Borough. We expect the winning bidder to deliver a minimum of 512 additional new Electric Vehicle "sockets" (as defined in the Contract at Schedule 4), of which: i) A minimum of 256 sockets to be located at our required sites as set out in Portfolios 1, 2 and 3 (see section 2.2.3 in this document for further information), with our £1.01m subsidy to support installations. ii) Further to this we would like the operator to match and extend our investment through private funding with a minimum additional 256 sockets, at our required sites or at additional sites (to be agreed with the Council). iii) The total minimum delivery of at least 512 additional new Electric Vehicle "sockets." To this end, Bedford Borough Council…

About the supplier

More from Bedford Borough Council

All contracts

More won by Connected Kerb Limited

All contracts

Recent construction work contracts

Sector overview