Competition with a shortlist
Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.
Key facts
- Suppliers
- Bam Nuttall Limited, Hitachi Energy UK Limited and Hitachi Energy Sweden AB, Prysmian Powerlink s.r.l
- Value
- £2,904,000,000 across 2 lots
- Procedure
- Negotiated procedure with prior call for competition
- Sector
- Construction work · Construction work (CPV 45000000)
- Region
- South East
- Official notice
- 016364-2024 on Find a Tender
- Timeline
-
- Contract date28 Feb 2024
- Published23 May 2024Published 85 days after the contract date
Description
National Grid Electricity Transmission PLC (NGET) and Scottish Hydro Electric Transmission PLC (the "Employers") are jointly developing a HVDC link between Peterhead, Scotland and Drax, England (the "HVDC Link"). The award is for two Engineering, Procurement & Construction (EPC) contracts for the detailed design, engineering, procurement, manufacture, installation, construction, testing, commissioning, spares provision, operational hand-over and maintenance of the HVDC Link between Scotland and England. The procurement is structured in 2 lots consisting of: Lot 1 - EPC of HVDC, Voltage Source Commutated (VSC) converter stations and HVAC underground cable between Converter Station and Point of Common Connection (PCC) at both Peterhead and Drax. Lot 2 - EPC of HVDC submarine and underground cable between converter stations at both Peterhead and Drax.
Lots in this award
| Lot | Supplier | Value |
|---|---|---|
| Peterhead to North Yorkshire HVDC Link Project | Bam Nuttall Limited, Hitachi Energy UK Limited and Hitachi Energy Sweden AB | £1.31bn |
| Peterhead to North Yorkshire HVDC Link Project | Prysmian Powerlink s.r.l | £1.6bn |
About the suppliers
Bam Nuttall Limited, Hitachi Energy UK Limited and Hitachi Energy Sweden AB: every public contract they have won.
Prysmian Powerlink s.r.l: every public contract they have won.