Contract award · 1 May 2024

BM.23.039 SWEC Programme: East Road Building – Base Build

The Trustees of the British Museum awarded “BM.23.039 SWEC Programme: East Road Building – Base Build” to Quinn (London) Limited on 1 May 2024.

Construction workLondon

Value Not published

Competition with a shortlist

Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.

Key facts

Buyer
The Trustees of the British Museum · Body governed by public law
Value
Not published
Procedure
Restricted procedure
Sector
Construction work · Building construction work (CPV 45210000)
Region
London
Timeline
  1. Contract date1 May 2024
  2. Published28 May 2024Published 27 days after the contract date

Description

The East Road Building (ERB) is part of the British Museum’s overall South West Energy Centre (SWEC) Programme. The SWEC programme is an estate-wide array of projects to decarbonise the British Museum’s Bloomsbury Estate. The East Road Building project comprises the replacement of the existing East Road building located in the north-east corner of the Bloomsbury site with a new building, circa 680sm, spread over basement, ground and first floors. The East Road building will primarily provide space for site-wide central plant room as well as workshops spaces for carpentry, electrical and locksmiths and maintenance facilities; and welfare, changing and WC facilities. Summary of work elements in this tender: •Basement excavation and construction •Reinforced concrete structural frame •Brickwork cladding, external doors and windows •Roof finishes and rooflights Refer to the indicative design information uploaded with this SQ for further details of the proposed building. This procurement pr…