Competition with a shortlist
Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.
Key facts
- Buyer
- Hampshire County Council · Regional or local authority
- Supplier
- Mays Technical Limited SME
- Value
- £63,711.30
- Procedure
- Call-off from a framework agreement
- Sector
- Construction work · Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 45230000)
- Region
- South East
- Official notice
- View on Contracts Finder
- Timeline
-
- Contract date21 Oct 2024
- Published6 Dec 2024Published 46 days after the contract date
Description
3. Description of Call-offA call-off from Lot 1 of the Generation 5 Civil Engineering, Highways & Transportation Collaborative Framework 2024 - 2028 (award notice published 01 February 2024). Construction of a tighter junction on Bridge Road junction with Havant Road (A259) such that at its widest point it is 14m wide with a 4m radius on both sides. The works will include replacing the existing footway kerblines (total length 59m) on both sides of the road and 3 new gullies (2 of which are to be connected to a culvert and 1 to a manhole). Tactile paving slabs are to be installed on both sides of the tightened junction. The works also include the widening of a footway outside 167 - 187 Victoria Road to 2m (total length 50m)
About the supplier
Mays Technical Limited: every public contract they have won, plus their Companies House record (company 13429007).