Contract award · 5 Oct 2026

Refurbishment of Units 1-8 and external yard replacement at Admiral Hyson Industrial Estate

Glasgow City Council (as administering authority for the Strathclyde Pension Fund) awarded “Refurbishment of Units 1-8…” to 7Formation for £5.21m.

Construction workLondon

Competition with a shortlist

Competitive procedure with a selection stage: suppliers were shortlisted before being invited to bid.

Key facts

Supplier
7Formation SME
Value
£5,212,273.63
Procedure
Restricted procedure
Sector
Construction work · Ground-drainage work (CPV 45111240)
Region
London
Timeline
  1. Contract date5 Oct 2026
  2. Published27 Oct 2026Published 22 days after the contract date

Description

The works will comprise the full refurbishment of the industrial estate, including the internal and external elements of the units and the replacement of the external yard and underground drainage. Currently, the units are vacant and have been stripped out back to shell and core (including all utilities). The works are anticipated to include the replacement of the (assumed) asbestos cement sheet roof with a new insulated system, the replacement and refurbishment of the vertical built-up cladding system, new rooflights, the installation of a small array of photovoltaic (PV) panels to each unit, new external windows and doors, new roller shutter doors, the decoration to all internal surfaces including masonry/steelwork/concrete, new warehouse floor coating, new partitioning forming WC cubicles, new plasterboard lining throughout, new WC blocks inc showering facilities, new fitted out first floor office comprising suspended ceilings and floor coverings, new internal doors and the install…

About the supplier

More from Glasgow City Council (as administering authority for the Strathclyde Pension Fund)

All contracts

No contracts to show yet.

More won by 7Formation

All contracts

Recent construction work contracts

Sector overview