Contract award · 31 Mar 2025

CWF Lot 2A - Reconstruction of Scrithwaite Wood Retaining Wall

Westmorland and Furness Council awarded “CWF Lot 2A - Reconstruction of Scrithwaite Wood Retaining Wall” to Metcalfe Plant Hire Limited for £117k.

Construction workNorth West

Procedure

Procedure as published: Other -.

Key facts

Buyer
Westmorland and Furness Council · Regional or local authority
Value
£116,867.99
Procedure
Other -
Sector
Construction work · Construction work (CPV 45000000)
Timeline
  1. Contract date31 Mar 2025
  2. Published31 Mar 2025Published the same day

Description

his project is for the design and reconstruction of approximately 15m length of Scrithwaite Wood Retaining Wall on the C5008, North of Broughton Mills. The existing wall has partially collapsed, with an adjacent length being in an unstable condition. The wall retains approximately 2.1m (max) of land (public highway) above a steep inclined slope. The collapsed section of the wall has created a residual slope of consolidated material with a 1m vertical slope of exposed natural gravel material below the defined road construction. The Contractor will be required to undertake the role of Principal Designer & Principal Contractor and fulfil their obligations in accordance with CDM 2015. The Contractor will be required to design and construct the permanent engineered highway retaining wall. The Contractor will be required to design and check temporary works as required e.g. provision of shoring for excavation. The Contractor should consider the design period required for the temporary and pe…

About the supplier

More from Westmorland and Furness Council

All contracts

More won by Metcalfe Plant Hire Limited

All contracts

Recent construction work contracts

Sector overview