Procedure
The procedure was not stated in the notice.
Key facts
- Suppliers
- Not named
- Value
- Not published
- Procedure
- Not stated
- Sector
- Construction work · Structural steel erection work for structures (CPV 45262420)
- Region
- East of England
- Official notice
- View on Contracts Finder
- Timeline
-
- Contract date1 May 2025
- Published1 May 2025Published the same day
Description
WP12.5 Architectural Metalwork Scope of work: OOC HS2 Station Architectural Metalwork Package (WP12.5) consists of the design for construction and manufacture, supply, installation and assurance of architectural metalwork to the front of house HS2 Station areas, the Great Western Main Line/ Conventional Station (GWML) and Shared Accommodation Building (SAB). The scope of this package includes the following key elements: • Steel and glazed balustrades, with integrated lighting. • Timber handrails, with integrated lighting. • Platform barriers. • Lighting columns and armatures. Key deliverables will be: • Design Development: Prepare the design for construction and manufacture of architectural metalwork, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements and ancillary elements to meet the prescribed performance requirements. • Samples and Prototypes: Prov…