Contract award · 1 Jul 2026

Fit Out - WP12.7.1 - Painting and Sealants - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV awarded “Fit Out - WP12.7.1 - Painting and Sealants - Old Oak Common (S4) Station” to CC Infrastructure Services on 1 Jul 2026.

Construction workEast of England

Value Not published

Procedure

The procedure was not stated in the notice.

Key facts

Value
Not published
Procedure
Not stated
Sector
Construction work · Painting and protective-coating work of structures (CPV 45442120)
Timeline
  1. Contract date1 Jul 2026
  2. Published7 Sep 2026Published 68 days after the contract date

Description

Scope of work: OOC HS2 Station WP12.7.1 - Painting and Sealants package consists of the verification of products, supply, application and assurance of paint and sealants applied to concrete and blockwork substrates in the HS2 Station areas, the Great Western Main Line/ Conventional Station (GWML) and Shared Accommodation Building (SAB). The scope of this package includes the following: • Samples: Provide samples and benchmarks as deemed necessary to ensure compliance with design, quality standards and client requirements. • Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment to enable the application of paint and sealants to the specified areas. • Assurance and Certification: Generate and supply comprehensive assurance documentation for products applied to concrete and blockwork substrates. • Coordination: Coordination of works with preceding and succeeding trades to meet project requirements. Additional information: BBVS - Code o…