Contract award · 12 Oct 2025

Fit Out -WP12.2.3 HS2 Accommodation Blocks, LEER, Cores and Columns Cladding Envelope - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV awarded “Fit Out -WP12.2.3 HS2 Accommodation Blocks, LEER, Cores and Columns Cladding Envelope…” to Sorba UK on 12 Oct 2025.

Construction workEast of England

Value Not published
WinnerSorba UK

Procedure

The procedure was not stated in the notice.

Key facts

Supplier
Sorba UK
Value
Not published
Procedure
Not stated
Sector
Construction work · Cladding works (CPV 45262650)
Timeline
  1. Contract date12 Oct 2025
  2. Published8 Oct 2026Published 361 days after the contract date

Description

WP12.2.3 HS2 Accommodation Blocks, LEER, Cores and Columns Cladding Envelope Scope of work WP12.2.3 HS2 Accommodation Blocks, LEER, Cores and Columns Cladding Envelope consists of the design for construction and manufacture, supply, installation, and assurance of external cladding, overclad doors and all architectural metalwork to the accommodation blocks, Lift & Escalator Electrical Rooms (LEER) to the HS2 platforms and central core at concourse level. The scope of the package includes the following key elements: External cladding (glass wall lining system incorporating opaque fixed glazed units); Stainless-steel lining, flashing and skirting; Stainless steel louvered screen; Overclad doors; Walkway grille; Platform columns stainless-steel recess cover system. Key deliverables will be: Design Development: Prepare the design for construction and manufacture, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necess…

About the supplier

  • Sorba UK: every public contract they have won.

More from Balfour Beatty VINCI Systra JV

All contracts

Recent construction work contracts

Sector overview